HomeBusinessFourth line connectivity work will not start from today, BR will not...

Fourth line connectivity work will not start from today, BR will not operate for three days Achi-News

- Advertisement -

Achi news desk-Survey News Non-interlocking work will be done for fourth line connectivity at Jindal Steel Power Limited hut located between Janjgir Raigarh-Kirodimal stations. Due to this, the RBR MEMU passenger plying between Raigarh and Bilaspur will not run for the next three days from April 10. The railway administration is making efforts to complete the infrastructure development works as soon as possible. In this regard, for infrastructure development, non-integrated work will be done for fourth line connectivity at Jindal Steel Power Limited hut located between Raigarh-Kirodimal stations under South East Central Railway Bilaspur Division. These trains will remain cancelled: From April 10 to April 12, train number 08738/08737 Bilaspur-Raigarh-Bilaspur MEMU Passenger traveling from Bilaspur and Raigarh will remain cancelled. 0 from April 10 to April 12, train number 08736/08735 Bilaspur-Raigarh-Bilaspur MEMU passengers traveling from Bilaspur and Raigarh will remain cancelled.

spot_img
RELATED ARTICLES

Most Popular