HomeBusinessPCC path broken in Giridih. PCC route cut in Giridih: Road built...

PCC path broken in Giridih. PCC route cut in Giridih: Road built a year ago at a cost of Rs 3 crore, cut without NOC for laying pipes – Giridih News Achi-News

- Advertisement -

Except translation, this story has not been edited by achinews staff and is published from a syndicated feed.

While laying the pipeline of water tap scheme in Serua block of Gaon of Giridih without NOC, the same PCC road is demolished twice. Let us tell you that rural water supply scheme work is being done in Serua at a cost of around Rs 22 crore. Under which the Mus of Serua

.

Where pipes are laid by demolishing a PCC road. The road which is being demolished last year from Dabur Mor to Cherwa Bhaya Jorasimar was strengthened at a cost of around Rs 3 crore by the REO department. Which is destroyed by the rural water supply sensor by demolishing the road without taking NOC from the REO.

Road cut twice in 8 months, many links cut

In fact, in about 40 Musahari Tola houses from Serua, water already reaches each house through a small solar water tower. But while the pit was being excavated on the way for the pipeline to be installed, many people were cut off due to a JCB drilling machine.

Because of this, water supply stopped in more than a dozen houses. According to the villagers, 8 months ago, to lay the pipeline, PCC road was demolished and left in the same condition without laying the pipe. Here again, when the work was started to demolish the same road and install the pipeline, some people protested.

Order given to stop work: JE

JE Pramod Das of REO department said that no NOC has been taken from the contractor for cutting PCC road during pipeline laying. There have been reports of road demolitions without NOC. In this regard, the PHED department has been instructed to stop working for the time being. JE Jitendra Kushwaha of Drinking Water and Sanitation Department said that the places where PCC road has been demolished will be repaired after completion of the pipeline work.

(Except translation, this story has not been edited by achinews staff and is published from a syndicated feed.)
source link https://www.bhaskar.com/local/jharkhand/giridih/news/pcc-path-broken-in-giridih-133689935.html

spot_img
RELATED ARTICLES

Most Popular